Roof inspection
A live feed from the roof on an iPad while you watch from the ground, then a written read of what it needs and what it doesn't. About 15–20 minutes.
Most roofers price the biggest job. We look at repair and restoration first, tell you plainly what the roof needs, and only recommend a tear-off when it's the honest answer.
A live feed from the roof on an iPad while you watch from the ground, then a written read of what it needs and what it doesn't. About 15–20 minutes.
Leaks, storm damage, flashing, displaced tile. Fixed so water stays out, not patched to get through the season.
Full tear-off, decking repair, synthetic underlayment, and CertainTeed Landmark or Cool Roof shingles. Permit and disposal handled.
Replaced or resealed with the roof so the whole system sheds water the same way.
We arrive in the window we gave you. Running late, you get a call.
You see what we see. Nothing is described to you that you can't look at yourself.
Repair and replacement priced side by side where both are realistic. Financing available.
Old material off, decking and framing fixed where they need it, hazardous material removed properly.
Most replacements take 3–4 days. We walk it with you before we call it done.
A home with asbestos tile, leaks, and rotted framing underneath. We removed the hazardous material, repaired the damaged wood, and installed Cool Roof asphalt shingles on synthetic Pro-Guard felt. Two weeks, in the $15–20k range.
Most replacements take 3–4 days once we start: old roof off, repairs made, new roof on.
We're fully licensed, bonded and insured, and we don't cut corners on materials or the crew. A roof is a long-haul purchase.
Yes. Ask when you book and we'll walk you through the options.
Yes. That's the point of starting with repair.
Walk-through and written estimate at no charge, across Southern California. If it's not worth doing, we'll say so.
(818) 418-0488 Mon–Fri 9–7:30 · Sat 10–2 · Sherman Oaks